|
The water pressure test of No. 2 boiler of Datang Beiyi Power Generation was successful.The hydrostatic test of No. 2 boiler of Datang Beiyi Power Generation Co., Ltd. was successful, indicating that the main installation work of the boiler equipment of this unit has been fully completed. In order to ensure the successful completion of the milestone node of the No. 2 boiler hydraulic pressure test, Beiyi Power Generation Company organized the supervision and construction unit to carefully and meticulously inspect the heating surfaces before the hydrostatic test, and strictly followed the operation instructions to confirm the operation. After the start of the water. At 19:00, the design hydraulic pressure test pressure reached 39.16Mpa, and there was no leakage of 47,760 pressure welding joints. The hydraulic pressure test was successful and passed the inspection and acceptance of Xinjiang Special Equipment Inspection and Research Institute. Since the beginning of this year, Datang Beiyi Power Generation Co., Ltd. has set a goal of creating high-quality projects, strengthening the whole process control of engineering safety and civilization, quality technology, and schedule, as well as the construction of key paths such as boiler hydraulic pressure test and reverse power supply. Communicate and coordinate with design institutes, equipment manufacturers, and participating construction units to ensure that the project construction is progressing steadily according to the planned network nodes. |